From Hard Drop Tetris Wiki
(Created page with "'''Corporate Slave Train''' or '''社畜トレイン (Shachiku Torein)''' Is a unique Prophecy T-Spin Double method which is mainly used on a relatively flat terrain. This fo...") |
No edit summary |
||
Line 159: | Line 159: | ||
|} | |} | ||
Compare the 4th example of the | Compare the 4th example of the Corporate Slave Train's variations above with [[Kaidan Setups]] (both L and J are just swapped) (credit to ''kazu''). | ||
{| | {| | ||
Line 210: | Line 210: | ||
|} | |} | ||
Compare the | Compare the Corporate Slave Train's variation above with [[Cut Copy]] (both could be used for a quick consecutive T-Spin Doubles and the overhang for the second T-Spin Double could be prepared before executing the first T-Spin Double). | ||
{| | {| | ||
Line 240: | Line 240: | ||
|} | |} | ||
Diagonal shaped holes below | Diagonal shaped holes below Corporate Slave Train could be used to make three or more consecutive Corporate Slave Trains. The downside to this is that this variation requires a lot of Zs on demand and might block the Tetris hole (if there is one) located below the build for a few bags. | ||
{| | {| | ||
Line 275: | Line 275: | ||
|} | |} | ||
Corporate Slave Train could also be used as a direct follow-up to a [[T-Spin Triple]]. | |||
{| | {| | ||
Line 313: | Line 313: | ||
|} | |} | ||
Instead of directly doing the second T-Spin Double, repeating another | Instead of directly doing the second T-Spin Double, repeating another Corporate Slave Train is also possible and it also maintains a clean stack. In theory, this could be continued infinitely. But in practice, this requires alot of S and L on demand. This shares the same principle as [[Mechanical TSD Setups|Mechanical TSD v3]]. | ||
{| | {| | ||
Line 359: | Line 359: | ||
==External Links== | ==External Links== | ||
* [https://four.lol/methods/shachiku-train page] by FOUR on | * [https://four.lol/methods/shachiku-train page] by FOUR on Corporate Slave Train | ||
* [https://www.youtube.com/watch?v=fru9Jvk6jhM video] by ''kazu'' about Prophecy T-Spins | * [https://www.youtube.com/watch?v=fru9Jvk6jhM video] by ''kazu'' about Prophecy T-Spins | ||
[[Category:T-Spin Methods]] | [[Category:T-Spin Methods]] | ||
[[Category: Prophecy T-Spin]] | [[Category: Prophecy T-Spin]] |
Revision as of 03:38, 16 February 2020
Corporate Slave Train or 社畜トレイン (Shachiku Torein) Is a unique Prophecy T-Spin Double method which is mainly used on a relatively flat terrain. This form mainly uses S one column away from a wall and an L hanging on top of it in order to create a T-Spin Double which would then be immediately followed by another T-Spin Double. This setup was developed by Japanese players.
Generic Structure
As long as S has a place to be dropped with at least 2 blocks high wall on one end of S and a single gap on the other end of S before it hits wall, this technique's generic structure is always possible.
|
|
|
|
Variations, Other Uses, and Comparisons
As mentioned before, this technique is always possible as long S has a place to be dropped. Even though it's possible, doing it over a 3-wide hole is inefficient in most cases because the player is forced to make an unconventional overhang in order to achieve the second T-Spin Double.
|
If L has a place to be dropped on, players could drop the L first before spinning in the S later.
|
|
|
S and L could be substituted by other blocks. As long as it still maintains the same shape as the generic structure, it is still possible.
|
|
|
|
Compare the 4th example of the Corporate Slave Train's variations above with Kaidan Setups (both L and J are just swapped) (credit to kazu).
|
|
If it's possible, making the overhang for the second T-Spin Double on the other side of the build before the T for the first T-Spin Double comes could help on executing a much faster attack.
|
|
Compare the Corporate Slave Train's variation above with Cut Copy (both could be used for a quick consecutive T-Spin Doubles and the overhang for the second T-Spin Double could be prepared before executing the first T-Spin Double).
|
|
Diagonal shaped holes below Corporate Slave Train could be used to make three or more consecutive Corporate Slave Trains. The downside to this is that this variation requires a lot of Zs on demand and might block the Tetris hole (if there is one) located below the build for a few bags.
|
|
|
Corporate Slave Train could also be used as a direct follow-up to a T-Spin Triple.
|
|
|
Instead of directly doing the second T-Spin Double, repeating another Corporate Slave Train is also possible and it also maintains a clean stack. In theory, this could be continued infinitely. But in practice, this requires alot of S and L on demand. This shares the same principle as Mechanical TSD v3.
|
|
|